Saturday 28 November 2009

festival

As you were saying about festivals the other day Edgley, I think this one is a big deal, Shelley Page is on the judging panel.

https://www.encounters-festival.org.uk/

Wednesday 25 November 2009

Done my essay

http://www.ukessays.com/index-nlbanner.php

Tuesday 24 November 2009

Quickie

Boys, just to set the record straight - for friday bring in 2 folders, one for P.O, one for Splay - containing all your pre production work for this term.

Also Als if you wanted to do your shindig thursday night I can make it now, just not friday. Or if you want to stick to next monday thats cool with me aswell.

Im struggling with these essays guys...

X

Sunday 22 November 2009

Presentation

Everyone in at 9.00 tommorow to run through the P.O and Splay presentations. We're going to look like complete dicks if we dont know whose saying what and when!

Edge X

Guys

Are we ready for Monday? how did the rest of Friday go?

Monday 16 November 2009

More Sounds...

Grigs - a list of further sound effects needed...

- bed sheets rustle
- teeth glistening
- swoosh
- inhale
- heavy breathing
- mirror sheen
- polisher engine
- footsteps on clean kitchen floor
- wheel creak
- metal frame clanging
- grunts
- hand grabbing plastic tubing

Theres more i just cant think of them at the minute, that should keep you going though. We need to start getting them in the final animatic tommorow.

Wednesday 11 November 2009

Monday 9 November 2009

Simon's Materials

- Rubber tubing for electrical cords
- Clear, clean rubber tubbing for breathing tube
- Stainless steel for "Lifted" switches with those lines.
- Slightly Rusty red metal for large valve
- Grey Plastic for ports, terminals and small electrical equipment
- LED lights. On/Off. Reflective.
- Tiled Floor uncleaned. Slightly reflective.
- Tiled Floor clean and reflective.
- Ceramic sink
- Dirty metal for taps. Not insanely dirty just "used"
- Back Lit plastic casing for the back of the dials
- Cotton stitching for the seat
- Wood for chair seating
- Ceramic for pot (could be the same as the sink)
- Paper/Card for the bed side card
- White, painted metal for the bed rims
- White stitched cotton for the bed sheets and pillows
- Florescent lights in the ceiling
- Ceiling tiles

Sunday 8 November 2009

SUNDAY NIGHT!

this weeks going to be mental with essays presentations and all that jazz, so any work you could do tonight would be greatly appreciated. Im going to thumbnail. Please guys, lets stay one step ahead, and hopefully someone will get gold star in the morning X

Friday 6 November 2009

Thursday 5 November 2009

Sounds Needed

- Pump inhale
- Pump exhale
- Heart Monitor
- Machine blips/chatter
- One clock tick (we don't need a looping sound of a clock tick for every second.) It's more of a paklunk than a tick
- Lights turning on
- Light switch turning on
- Doors flapping
- Foot steps on tiles
- Swoosh (as he walks past the bed)
- Plug coming out
- Plug going in
- Machine revving
- Polisher loop (engine loop)
- Finger click
- Foot tape
- Boom/Doof for headphone banging
- Boing for bum shake
- Swish (for camera warp)

Tuesday 3 November 2009

Tasks:

Thought I'd remind everyone of the priorities for P.O over the next week or so...

Myself:

Model Jed
Music & Sound fx
Final dance move list
Pose board
Finish thumbnailing

Als:

Animatic
Sound fx
Finish thumbnailing
Finish machine

Si:
Splay
(If available for P.O then - further cloth, steam, texture and wire tests. Also could begin unwrapping finished machine parts?)


Grigs & Phil:
Splay

Note: these tasks need to be complete in the next 2 weeks, as well as anything Phil needs you to do :S.